I will take whatever gives us the following:
--enough replacement seats that we can take out the janky-ass metal bleachers for good
--an overhaul of the end zone fun zone that corrects the monstrosity that is that whole mess of low-elevation grade bleachers and disconnected sections that look like pizza slices
--an overhaul that corrects the terrible 1999/2000 addition of more seats on the students section side that extend waaaaay past the back of the NEZ. You know, the ones that are almost never filled and look shitty when the camera shows them on kickoffs and turn BSFS into Kyle Field.