0 Members and 1 Guest are viewing this topic.
ITK stuff, Frasier and Niles coming down March 13
The structure is 7 stories tall, as far as I can tell from the renderings. Plus and additional level for the 2 towers. http://www.kstatesports.com/weststadiumcenter/gallery.htmlWhat's a story in commercial development? 10-12 ft?
Vanier is going to look super pud trapped between this and the east side.ITK people, when do we get vanier replaced?
Hadn't seen this mentioned but on the John Currie Show last Saturday, Currie stated that the steel will be built up on both sides by the UT game.
KU is right on par with Notre Dame ... when it comes to adding additional conference revenue
Beer pro tip: never drink anything other than BL, coors, pbr, maybe a few others that I'm forgetting
Quote from: MakeItRain on November 09, 2012, 03:22:42 PMHadn't seen this mentioned but on the John Currie Show last Saturday, Currie stated that the steel will be built up on both sides by the UT game.wow, they must be planning on flying through that material.what is below the north side of the pressbox? conference rooms, weight rooms?
Quote from: ednksu on November 10, 2012, 12:35:41 AMQuote from: MakeItRain on November 09, 2012, 03:22:42 PMHadn't seen this mentioned but on the John Currie Show last Saturday, Currie stated that the steel will be built up on both sides by the UT game.wow, they must be planning on flying through that material.what is below the north side of the pressbox? conference rooms, weight rooms?I think there will be a ramp going down there so trucks can unload delicious nachos and other things of that nature.
ok, mr. itk, what's the planned date for the demolition of the dev?
On a side note, it looks like ku is getting closer to cobbling together enough government cheese coupled with raiding of the endowment to build an off campus track. Stay tuned.
Poster on GPC says Video Board and sound system upgrades are slated for this off season. Is this not Phase 3 stuff. People in the know, any confirmations?
Phase III: Student Athlete and Hospitality Amenities--- Strength and Conditioning Center--- Varsity Club and Seating Area--- Recruiting Lounge--- Video and Ribbon Board Additions--- Distributed Sound System--- South Stadium Fan Amenities--- Limestone Field Wall--- Field Perimeter Surface Upgrades
--- Video and Ribbon Board Additions--- Distributed Sound System
Quote from: "storm"nut on November 20, 2012, 10:39:15 AMPoster on GPC says Video Board and sound system upgrades are slated for this off season. Is this not Phase 3 stuff. People in the know, any confirmations?http://www.kstatesports.com/weststadiumcenter/masterplan.htmlQuotePhase III: Student Athlete and Hospitality Amenities--- Strength and Conditioning Center--- Varsity Club and Seating Area--- Recruiting Lounge--- Video and Ribbon Board Additions--- Distributed Sound System--- South Stadium Fan Amenities--- Limestone Field Wall--- Field Perimeter Surface Upgrades
Quote from: MadCat on November 20, 2012, 10:43:17 AMQuote from: "storm"nut on November 20, 2012, 10:39:15 AMPoster on GPC says Video Board and sound system upgrades are slated for this off season. Is this not Phase 3 stuff. People in the know, any confirmations?http://www.kstatesports.com/weststadiumcenter/masterplan.htmlQuotePhase III: Student Athlete and Hospitality Amenities--- Strength and Conditioning Center--- Varsity Club and Seating Area--- Recruiting Lounge--- Video and Ribbon Board Additions--- Distributed Sound System--- South Stadium Fan Amenities--- Limestone Field Wall--- Field Perimeter Surface UpgradesI know it is in Phase 3. I was asking if Phase 3 or parts of Phase 3 are being given the green light?
yeahhey captain crap. are they gonna do the limestone wall for next season?
Limestone walls seems like the cheapest, fastest, easiest way to make the stadium look loads better.