Title: Facility upgrades from Coloradmommacat's son
Post by: KITNfury on September 08, 2010, 03:52:09 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: SkinnyBenny on September 08, 2010, 03:57:45 PM
They need to build a limestone wall from the top of the existing upper deck to the ground.  It looks weird and kind of janky right now.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: twenty6 on September 08, 2010, 04:23:33 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

half of this is accurate.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: EllToPay on September 08, 2010, 04:27:22 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

half of this is accurate.

:surprised:
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: ednksu on September 08, 2010, 04:29:34 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

half of this is accurate.
elaborate
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: doom on September 08, 2010, 04:29:46 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

half of this is accurate.

:surprised:

does that mean the other half is inaccurate or you just don't have confirmation?  Also please highlight the accurate parts.   :cheers:
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: jtksu on September 08, 2010, 04:35:41 PM
Rule no. 1 of attempting to appear insidery:  Be super vague. 
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: KITNfury on September 08, 2010, 04:36:15 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

half of this is accurate.
Delete the bunk info please.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: Saulbadguy on September 08, 2010, 04:37:58 PM
Daughtercat? :fatty:
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: CNS on September 08, 2010, 04:52:05 PM
Would love CaptainCrap's input.

 :users:
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: Jmo on September 08, 2010, 05:03:54 PM
The AD department got estimates for a limestone wall around the field.....  Says that it is most likely not going to happen in the near future.   :embarrassed:
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: CNS on September 08, 2010, 05:04:34 PM
The AD department got estimates for a limestone wall around the field.....  Says that it is most likely not going to happen in the near future.   :embarrassed:

Would be ok losing this if the rest gets built.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: Jmo on September 08, 2010, 05:05:25 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

BTW...all of that is a rehash of what has been posted on GPC....not insidery at all.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: MadCat on September 08, 2010, 05:07:18 PM
The AD department got estimates for a limestone wall around the field.....  Says that it is most likely not going to happen in the near future.   :embarrassed:

Maybe we could purchase tarpaulin's that look like limestone.  :dunno:
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: "storm"nut on September 08, 2010, 05:10:32 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

BTW...all of that is a rehash of what has been posted on GPC....not insidery at all.

Kind of what I thought. I posted the bold area the other day and DAX has said the same thing as well.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: wiley on September 08, 2010, 05:11:22 PM
capt crap?
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: TheMadCatter on September 08, 2010, 05:15:36 PM
I want confirmation, damnit.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: sonofdaxjones on September 08, 2010, 05:59:46 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

I've heard that more private money than that has been raised, but don't have any way of confirming it right now.

Title: Re: Facility upgrades from Coloradmommacat's son
Post by: AbeFroman on September 08, 2010, 06:30:39 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

half of this is accurate.

That's still good step if half of this happens. And as long as the basketball facility is in that half.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: pissclams on September 08, 2010, 06:31:49 PM
Lane Stadium tower/press box expansion cost $52M of which $15M came from private donations, the rest came from debt servicing. 
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: CNS on September 08, 2010, 06:34:53 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.
They are practically begging for it to be goEMAW.com Practice Palace.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: doom on September 08, 2010, 07:03:05 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.
They are practically begging for it to be goEMAW.com Practice Palace.

 :love:
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: 06wildcat on September 08, 2010, 07:15:01 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

I've heard that more private money than that has been raised, but don't have any way of confirming it right now.



JFC, can't we have a little fun and start announcing these projects since we have way more than a 4:1 ratio on our bonding authority. Or are we still in the mode where debt is bad and we can only do things with cash in hand?
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: sonofdaxjones on September 08, 2010, 07:20:39 PM
There's was or is going to be the requisite public meeting for comment on the issuance of bonds by the Kansas Dev. Finance Authority on behalf of K-State Athletics Inc.   So that's pretty much the last step besides the BOR giving the issuance of bonds the final thumbs up. 

Things are being played very close to the vest for a number of reasons right now.

Title: Re: Facility upgrades from Coloradmommacat's son
Post by: ew2x4 on September 08, 2010, 07:38:15 PM
capt crap?

I know this guy is super insidery. But who is he?
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: Dugout DickStone on September 08, 2010, 08:51:50 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues, the new basketball practice facility will be a separate building on the west side of Bramlage instead of truly integrated into the building.  It will be connected via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl.

·         The existing east club level will be renovated to match the new west club level.

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level.

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor.

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale.

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.
They are practically begging for it to be goEMAW.com Practice Palace.

If we did that it would significantly limit the amount of cash we can give recruits.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: hemmy on September 08, 2010, 09:07:17 PM
capt crap?

I know this guy is super insidery. But who is he?

He has a great avatar, and is as insidery as it gets, pretty much always right.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: I_have_purplewood on September 08, 2010, 09:07:21 PM
There's was or is going to be the requisite public meeting for comment on the issuance of bonds by the Kansas Dev. Finance Authority on behalf of K-State Athletics Inc.   So that's pretty much the last step besides the BOR giving the issuance of bonds the final thumbs up. 

Things are being played very close to the vest for a number of reasons right now.



We owe Prince more than $3 mil.??   :ohno: :ohno: (ftp://:ohno: :ohno:)
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: 'taterblast on September 08, 2010, 09:12:31 PM
Rule no. 1 of attempting to appear being insidery:  Be super vague. 

fyp.  :peek:

Title: Re: Facility upgrades from Coloradmommacat's son
Post by: twenty6 on September 08, 2010, 11:06:17 PM
Quote
Again, my son is supplying me with info he's receiving in his office...says an announcement is forthcoming about these improvements....I'm just cutting and pasting his email so the board police can ignore any misspellings or gramatical errors because he's writing in between projects.  tongue



·         Due to fire code and ADA issues (not the reason as east/west are nearly identical), the new basketball practice facility will be a separate building on the west (east) side of Bramlage instead of truly integrated into the building.  It will be connected (no) via enclosed walkways, etc., but a full connection would have triggered a full (and expensive) upgrade of Bramlage to meet all modern fire and ADA standards.

·         The existing east side upper deck will get new restrooms (most likely) and concessions in a structure built off the side of the existing one.

·         A new structure will be built on the west side, replacing the existing press box and suites.  One poster strongly suggested we look closely at what has been done by VaTech at Lane Stadium.  They indicated the structure will be a major improvement, with a nice (limestone?) façade, and will include new suites, club level seating, and press areas.  It might stretch end zone to end zone, with 3 or 4 levels that will overhang the current seating bowl. (some iteration of this)

·         The existing east club level will be renovated to match the new west club level. (maybe someday)

·         They weren’t sure if it was a serious consideration now in this phase, but there are talks to add permanent seating on the NE and NW corners of the stadium by curving the seating bowl around and over the existing grass/ landscaped areas to further enclose the stadium and further increase the noise level.  This seating would replace the existing aluminum bleachers placed on the concourse level. (not feasible)

·         Additional fan amenity improvements (new bathrooms, concessions) on the concourse.

·         The new football practice facility is a long term goal (possible north of Kimball Ave and connected to the Vanier Complex via skybridge), but could change with a major donor. (incredibly long term.  skybridge?  no.)

·         They have $45 million in state-issued bonds already, with at least an additional $12 million in private donations lined up for the projects.  Still no lead naming rights donor (not from what i understand) for the basketball practice facility though.  It wasn’t clear, but if I understood it correctly, we may be looking for more bonding authority at an upcoming regents/ state bond authority meeting.  Either that, or the meeting is to discuss the existing bond sale. (all donations for bball practice and bonding for football)

·         After being almost $2 million in the red when he took over, Currie has the athletic department in the black now.

half of this is accurate.

my comments in bold.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: sys on September 09, 2010, 01:13:28 AM
Maybe we could purchase tarpaulin's that look like limestone.  :dunno:

great idea.  fantastic ood upgrade.  i'm emailing this to currie.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: jtksu on September 09, 2010, 01:26:09 AM
Just cover the whole damn thing with limestone tarps.  Would look sweet.
Title: Re: Facility upgrades from Coloradmommacat's son
Post by: sys on September 09, 2010, 01:42:41 AM
Just cover the whole damn thing with limestone tarps.  Would look sweet.

pffft, that's ridiculous.  no, just for the tunnel.