goemaw.com

General Discussion => Essentially Flyertalk => Topic started by: Jeffy on March 22, 2010, 03:30:43 PM

Title: K-18 Construction news
Post by: Jeffy on March 22, 2010, 03:30:43 PM
Reconstruction of K-18 from Wildcat Creek road to Seth Child has been canceled.  (I guess the feds were out of money or something)
Plans are still in place to redo the interchange around Ogden.

Title: Re: K-18 Construction news
Post by: WillieWatanabe on March 22, 2010, 03:39:41 PM
Color me surprised...

do they mean the interchange around the 12th Street Entrance or the northeast part of Ogden??
Title: Re: K-18 Construction news
Post by: Jeffy on March 22, 2010, 04:12:31 PM
Color me surprised...

do they mean the interchange around the 12th Street Entrance or the northeast part of Ogden??

There will be an interchange at Walnut Street (near the concrete plant).  The new roadway will cut out across the fields north of the cracker box condos and rejoin existing 18 near 70.

The 12th street bridge is part of the project that they are building right now (which includes the river bridge).  Should be done before too terribly long I believe. 
Title: Re: K-18 Construction news
Post by: WillieWatanabe on March 22, 2010, 04:18:14 PM
Quote
The 12th street bridge is part of the project that they are building right now (which includes the river bridge).  Should be done before too terribly long I believe.

OK. Yeah that should be done before Summer I imagine.

Quote
The new roadway will cut out across the fields north of the cracker box condos and rejoin existing 18 near 70.

I was with you till the near 70 part...