Used a 10 ton jack this morning to lift my house and replace some rotten floor joists for the new master suite closet & hall. This space was a jack and jill bathroom. Was not as hard as I though, took about 2 hours.
The rest of the afternoon I will lay down the sub-floor, frame in closet with pocket door, frame pocket door between master & suite hall, frame walk-in shower, and frame in toilet closet with pocket door. Pretty productive day.