Currently in the process of two major "jobs":
1. Building an Olds 455 engine bored 60 over and rebuilding/beefing up a th400 transmission for my 1964 Chevy C10. The engine should put out 425+ HP and 500+ lbft of torque.
I have already added bags all around, replaced rockers, and painted it myself.
2. Adding rooms to our attic (approx. 500 sq. ft). I had a contractor build the stairs as I did not want to screw those up. Father-in-law (30 years in HVAC) installed new HVAC. I am doing everything else. Currently finishing up drywall. Drywall is awful and takes forever with only one person. It doesn't help having so many odd angles in attic. My daughter's 9th b-day is Feb. 5th and my wife says the upstairs must be finished by her party. crap.
[attachment deleted by admin]