hire it out. It took me the entire day on Saturday just to mark and dig (auger) the posts (28). I have a huge slope on one area of the lawn and it was a rough ridin' nightmare trying to get them lined up. Yesterday leveled and set the posts, then poured the concrete. Now I wait. The hard part is done tho. Now just rails and pickets. Not sure it was worth the money I saved.